Paras Padma : Redevelopment of the hydrotherapy pool

13 octobre 2014

 

With the help of the Decathlon Foundation, the redevelopment of the hydrotherapy pool began on 13/10/2014.

This project will allow access to the pool to a larger number of children learning to swim.

The main actions expected by the end of 2014:

– Cleaning the frame

– Drainage Basin and réoxygénisation

Ensuring a level identical and sustainable water treatment activities

– Construction of a new therapeutic route around the basin

– Secure Site

– Construction of a cloakroom and a shelter for equipment

– Expansion of access

– Establishment of an additional scale for more independent children

-->

Laisser un commentaire

Votre adresse de messagerie ne sera pas publiée. Les champs obligatoires sont indiqués avec *